Demonstration build for REALM Studios — Growth Rebels · placeholder imagery, sample content
Waterfront

Maribyrnong Waterfront

Integrated water management turning a working riverfront into resilient public space.

Approach

A waterfront that works when the water rises.

The design treats flood mitigation and public amenity as the same problem. Terraced edges, blue-green infrastructure and re-established habitat let the river flood safely while giving the community a riverfront to use every other day of the year.

The project as a system.

3.1 km
River edge reactivated
1-in-100
Flood event designed for
7
Integrated water systems
12 ha
Habitat restored
Image placeholder

Flood mitigation as landscape.

Rather than hiding infrastructure behind concrete, the water systems are expressed in the landscape: swales, wetlands and level changes that read as parkland and perform as engineering.

Approached as a combination of flood mitigation, blue-green infrastructure, habitat, movement networks and open space, not simply making a nice promenade.
Sample project narrative
Layout: Grid